The first model
| |
|
Between the development and the real operation of each aggregate lie many, sometimes empty kilometres and in most cases a period of 6 months up to 3 years. The construction of the first prototypes, which are then checked for their readiness for series production in a lengthy test process is an important step, allowing any deficiencies in the design to be recognised and rectified.
The construction and testing of prototypes has been among our specialities for years. Pioneering spirit, commitment and our sophisticated production and assembly systems as well as the factorys own measuring room with test-bench enable us to manufacture the most varied of prototypes, which are constantly improved and optimised in an intensive test process until werden. they are ready for series production.





Print
